Just a few shots today. More work by the plumber and the HVAC team and we met with the electrician for a walk-through.
Roofing shingles have arrived. This is only about half of them, the rest were delivered to the other side of the house.
You can see the metal trim they're putting on the edge of the roof in this photo.
This is the water feed for the entire house. Capped for now until the guy comes out to install the new well pump. The vent above it is for the dryer. It can't have been fun to drill through bricks.
There's a drain in the master shower now. Always a good thing.
And this is the rough hardware for the master shower. That's all for now. We'll have shots of the new roof tomorrow!
No comments:
Post a Comment