It's been a while since we had anything worth showing but things seems to be moving again this week! We're still waiting on lumber delivery to finish the trim and stairway, but they're going ahead with some of the tile work, flooring and backfilling.
This isn't a very exciting shot because you can't see the vinyl that's been put down on that floor. They've covered it with brown paper to protect it. Oh well.
This is the small half bath near the great room. It has tile backer board installed.
The master bath. Backer board on the floors and walls of the shower (which they've also painted with some waterproof material). The tile you see stacked up goes in the shower area.
This stack is the tiles that go on the floors of the master bath and half bath. They are elongated black tiles.
We're having 7 truckfuls of dirt delivered to the house to help grade from the house to the level of the yard.
The back is already looking good!
As are the sides of the house. No more black tar visible on the bricks! Needs grass.
No comments:
Post a Comment